Thank you for considering Crl Components Inc part number DD101 LONG LEAD, an item we carry that is listed with the NSN 5910-00-678-8157 and product description “Capacitor Fixed Ceramic Dielectr.” This component is available for purchase through our website at this time, so complete the Request for Quote (RFQ) form provided below if you would like to receive pricing information for your comparisons. Simply offer our staff details like your desired quantity, budget, and delivery timeline to help us craft the best solution for your needs.
Note : We Will Not Share Your Information To Any Third Parties.
We aim to make the process of locating and procuring exact items simple, which is why we feature key listing details with every offering. For example, part number DD101 LONG LEAD was specifically produced by Crl Components Inc under CAGE Code 71590, and with the NSN 5910-00-678-8157, it belongs to FSC 5910 Capacitors. Additionally, all stock comes delivered with any applicable qualifying certifications or manufacturer trace documentation for your further benefit. With all of this in mind, be sure to submit a request for part number DD101 LONG LEAD today, knowing we will be in touch shortly after reviewing your information.
NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
---|---|---|---|---|---|---|
5910-00-678-8157 Item PartTypeName: CAPACITOR,FIXED,CERAMIC DIELECTR | 5910 | 006788157 | 0 | P | ||
CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
U | A | 0 | ||||
Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
064-064 | 3 | 9 | 5 |
MRC | Criteria | Characteristic |
---|---|---|
AAQL | BODY STYLE | W/O MTG FACILITIES,RADIAL TERMINALS |
AARG | RELIABILITY INDICATOR | NOT ESTABLISHED |
ABJT | TERMINAL LENGTH | 1.500 INCHES MINIMUM |
ABPM | BODY DIAMETER | 0.290 INCHES MAXIMUM |
ADAQ | BODY LENGTH | 0.156 INCHES MAXIMUM |
AEBS | CENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO DIAMETER | 0.250 INCHES NOMINAL |
AEBT | TERMINAL DIAMETER | 0.025 INCHES NOMINAL |
AEBZ | SCHEMATIC DIAGRAM DESIGNATOR | NO COMMON OR GROUNDED ELECTRODE(S) |
AGAV | END ITEM IDENTIFICATION | MISSILE,AI-TO-AIR,PHOEBNIX (AIM-54); TELETYPE,MODEL 28; TEST CONSOLES,MINI-SACE; ENGINE,AIRCRAFT TF33-PW-102 (C-135E,EC-135H/K/P); MISSILE,AIR-TO-AIR,SPARROW (AIM-7); SUPPORT EQUIPMENT,MX PEACEKEEPER MISSILE; SUPPORT EQUIPMENT,B |
CQBQ | CAPACITANCE VALUE PER SECTION | 100.000 PICOFARADS SINGLE SECTION |
CQFB | VOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE | -56.0/22.0 WITHOUT VOLTAGE APPLIED SINGLE SECTION |
CQJJ | NONDERATED OPERATING TEMP | -55.0 DEG CELSIUS MINIMUM AND 85.0 DEG CELSIUS MAXIMUM |
CQWM | NONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION | 1000.0 DC SINGLE SECTION |
CRTL | CRITICALITY CODE JUSTIFICATION | FEAT |
CRTP | TOLERANCE RANGE PER SECTION | -10.00 TO 10.00 PERCENT SINGLE SECTION |
CWJK | CASE MATERIAL | PLASTIC |
CWPK | INSULATION RESISTANCE AT REFERENCE TEMP | 10000.0 MEGOHMS |
CWSG | TERMINAL SURFACE TREATMENT | SOLDER |
FEAT | SPECIAL FEATURES | WEAPON SYSTEM ESSENTIAL |
TTQY | TERMINAL TYPE AND QUANTITY | 2 UNINSULATED WIRE LEAD |
If You’re Ever Looking for NSN parts Or Have an Aircraft On Ground Situation, Don’t forget That We offer Competitive Pricing and Guaranteed On-Time Delivery.
Request for Quote